Energy modelling & compliance · Canada
The energy report your permit is waiting on.
EnerBate builds calibrated energy models and the compliance reports that come out of them — Step Code, NECB, SB-10, Toronto Green Standard and CSA F-280. Most standard projects are delivered in 4 business days.
- Reports delivered
- 300+Reports deliveredMLI Select and building permit, all approved
- Days turnaround
- 4Days turnaroundFor most standard projects
- Code paths
- 2Code pathsPart 3 and Part 9 compliance
Code paths and programmes we report to
- BC Energy Step Code
- NECB
- OBC SB-10
- Toronto Green Standard
- CSA F-280-12
- ASHRAE 90.1
- CMHC MLI Select
CMHC MLI Select
How many energy points is your project on track for?
CMHC moved the reference to NBC 2020 / NECB 2020 on 30 September 2026. Seven questions and about two minutes gives you an estimate of the points your project would earn, and the gap to the next tier. Your first MLI Select report is free — one per company.
Services
Modelling, audits and the reports that come out of them
Six services that cover a building from permit application through to post-occupancy verification.
Whole-Building Energy Modelling
Calibrated hourly models for permit and rebate submissions.
Learn more
Energy Audit Study
ASHRAE-style audits with costed conservation measures.
Learn more
CSA F-280 Heat Loss & Gain
Room-by-room design loads for correct equipment sizing.
Learn more
Summer Overheating Analysis
Passive performance under current and 2050 climate files.
Learn more
Compliance Reporting
Permit and rebate packages across provincial code paths.
Learn more
Accessibility Reporting
CSA B651 and Rick Hansen Foundation site evaluations.
Learn more
Why EnerBate
Built to pass review the first time
Fast turnaround
Most standard projects are delivered in 4 business days, which is usually the difference between a permit cycle met and a permit cycle missed.
Accuracy that prevents rework
Models built to the code path as written, so a reviewer’s comment is a question rather than a resubmission.
Reasonable pricing
Costed for the size of the project rather than a flat consultancy rate, and the whole schedule is published — you can price a project before you call us.
Direct expert contact
You speak to the person building the model, not to an account manager relaying questions.
Regional code knowledge
Step Code in BC, SB-10 and TGS in Ontario, Part 9 volume in Québec — each with its own reference path.
It has been an absolute pleasure working with you and the EnerBate team. You are responsive, flexible and provide outstanding value!
Result on that project
28.2% below the NECB 2020 reference — CMHC MLI Select Level 1
Modelled design-stage result from the delivered report. Results vary by project.
Selected work
Projects we have modelled



Part 3 — Institutional
Gwa'sala-'Nakwaxda'xw Early Childcare Centre
183 Ba’as Rd, Tsulquate Reserve, Port Hardy, BC
Where we work
Every province files under a different path
A reference model built to the wrong code path has to be built again. We confirm which one applies before any modelling starts.
British Columbia
BC Energy Step Code, CleanBC, FortisBC and BC Hydro programmes.
Ontario
Toronto Green Standard, OBC SB-10 and Enbridge programmes.
Québec
Part 9 residential modelling volume across Québec centres.
Project types we serve
Custom homes
Single-family residential
Townhouse developments
Multi-unit connected housing
Small multi-unit
Low-rise apartment buildings
Large multifamily
High-rise residential towers
Commercial and institutional
Offices, retail and public buildings
Send us the drawings. We’ll send back a quote.
Tell us the project type, the municipality and the code path you are filing under — that is usually enough for a firm price and a delivery date.