EnerBate Solutions Inc.

Energy modelling & compliance · Canada

The energy report your permit is waiting on.

EnerBate builds calibrated energy models and the compliance reports that come out of them — Step Code, NECB, SB-10, Toronto Green Standard and CSA F-280. Most standard projects are delivered in 4 business days.

Reports delivered
300+Reports deliveredMLI Select and building permit, all approved
Days turnaround
4Days turnaroundFor most standard projects
Code paths
2Code pathsPart 3 and Part 9 compliance

Code paths and programmes we report to

  • BC Energy Step Code
  • NECB
  • OBC SB-10
  • Toronto Green Standard
  • CSA F-280-12
  • ASHRAE 90.1
  • CMHC MLI Select

CMHC MLI Select

How many energy points is your project on track for?

CMHC moved the reference to NBC 2020 / NECB 2020 on 30 September 2026. Seven questions and about two minutes gives you an estimate of the points your project would earn, and the gap to the next tier. Your first MLI Select report is free — one per company.

Services

Modelling, audits and the reports that come out of them

Six services that cover a building from permit application through to post-occupancy verification.

Why EnerBate

Built to pass review the first time

  • Fast turnaround

    Most standard projects are delivered in 4 business days, which is usually the difference between a permit cycle met and a permit cycle missed.

  • Accuracy that prevents rework

    Models built to the code path as written, so a reviewer’s comment is a question rather than a resubmission.

  • Reasonable pricing

    Costed for the size of the project rather than a flat consultancy rate, and the whole schedule is published — you can price a project before you call us.

  • Direct expert contact

    You speak to the person building the model, not to an account manager relaying questions.

  • Regional code knowledge

    Step Code in BC, SB-10 and TGS in Ontario, Part 9 volume in Québec — each with its own reference path.

It has been an absolute pleasure working with you and the EnerBate team. You are responsive, flexible and provide outstanding value!

Founder — Purpose-built rental developer, OntarioCMHC MLI Select energy modelling

Result on that project

28.2% below the NECB 2020 reference — CMHC MLI Select Level 1

Modelled design-stage result from the delivered report. Results vary by project.

Selected work

Projects we have modelled

All projects →

Where we work

Every province files under a different path

A reference model built to the wrong code path has to be built again. We confirm which one applies before any modelling starts.

  • British Columbia

    BC Energy Step Code, CleanBC, FortisBC and BC Hydro programmes.

  • Ontario

    Toronto Green Standard, OBC SB-10 and Enbridge programmes.

  • Québec

    Part 9 residential modelling volume across Québec centres.

Project types we serve

Send us the drawings. We’ll send back a quote.

Tell us the project type, the municipality and the code path you are filing under — that is usually enough for a firm price and a delivery date.